West Campus Lofts
Texas

This student housing project was the first modular multi-family building in Waco, Texas. Hayes Modular had the expertise to turnkey construct this 51,768-square-foot building in under 10 months. The exterior incorporates the Waco/Baylor masonry theme and complements the historically significant community while utilizing 21st century modular construction methods.

0 SQ. FT.
0 Modules
military
Fort Bliss (full project)
Texas

Hayes Modular installed 2,400 modules over four contract periods in one of the largest modular U.S. military projects. The 34 UEPH buildings were equivalent in size to a 140-room hotel. We erected one building every nine days, finishing on time and on budget.

0 SQ. FT.
0 Modules
commercial
Holiday Inn Express Alliance
Nebraska

Hayes Modular installed 36 modules in four days. Using a modular solution saved Holiday Inn Express 27,000-man hours at the job site. That’s 27,000 fewer hours for a general contractor to worry about safety. Other benefits included a reduced laydown and staging area, fewer lost materials and a more energy-efficient finished product.

0 SQ. FT.
0 Modules
health care
Mercy Hospital
Missouri

Hayes Modular was subcontracted to install and finish out approximately 150,000 square feet of a permanent modular health care facility. This impressive hospital looks exactly like a traditionally built hospital. The only difference is that each of its steel and concrete modules was engineered and manufactured off-site. The building not only exceeds strict International Building Code for hospitals, but is also 30 percent stronger than the original nine-story St. John’s Regional Medical Center.

0 SQ. FT.
0 Modules
commercial
AC Hotel Louisville Downtown “NuLu”
Kentucky

Hayes Modular installed 8 modules per day to complete this project, reducing on-site work by 7 months. Located in the dense NuLu district, the modular approach minimized neighborhood disruption, noise, and construction debris while achieving LEED certification. This efficient process delivered significant cost savings and a faster time to completion.

0 SQ. FT.
0 Modules